
Standards
0.5m: 48.3*4.0*485.3mm
1.0m: 48.3*4.0*990.6mm
1.5m: 48.3*4.0*1485.9mm
The aluminum Kwikstage scaffold is an easy-to-use lightweight system, which is simple and quick to install, saves labor costs, and therefore is more cost-effective.

0.5m: 48.3*4.0*485.3mm
1.0m: 48.3*4.0*990.6mm
1.5m: 48.3*4.0*1485.9mm

Material: Q235
Size: 50*50*5mm
Surface Finish: HDG

Material: Q235
Tube: 48.3*3.2mm
Surface Finish: HDG

Material: Q235
Tube: 48.3*3.2mm
Surface Finish: HDG

Material: Q235
Steel: 50*50*5.0mm
Surface Finish: HDG

Material: Q235
Tube: OD48.3*3.2mm
Surface Finish: HDG

0.7m: 1.8*228.63.5*760mm (2’6″)
1.2m: 1.8*228.63.5*760mm (4’2″)
1.8m: 1.8*228.63.5*1828mm (6’0″)

Material: Q235
Surface Finish: HDG
Length: 1.2/1.8/2.4m

1.5m Rise Stair / 6.61-T6
Stair Handrails / S235 (Q235)
Stair Top Rails / S235 (Q235)

1.5m Rise Stair / 6.61-T6
Stair Handrails / S235 (Q235)
Stair Top Rails / S235 (Q235)

Material: Q235
Rod: OD.36*650mm
Zinc Plated Surface

Material: Q235
Rod: OD.36*650mm
Zinc Plated Surface

Material: Q235
36mm*650mm*150mm
Surface Finish: HDG

Material: Q235
36mm*650mm*150mm
Surface Finish: HDG

Material: Q235
Standard: AS/NZS standard
Size: 0.7m, 1.2m, 1.8m, 2.4m

1 board wide: 250mm*750mm
2 board wide: 500mm*750mm
3 board wide: 700mm*750mm
All components of the scaffold are made of light aluminum alloy, which is only one-third of the weight of a traditional steel structure scaffold.
Lightweight aluminum alloy components help build aluminum kwikstage scaffolding quickly. It completely gets rid of the trouble of overweight scaffolding and can be easily built, moved, transported, stored, and received, thus improving work efficiency, saving time, and reducing costs.
We will serve you wholeheartedly and provide the most professional and reliable products and solutions.


APAC uses full weld techniques to ensure maximum strength and durability, establishing a solid, permanent bond between metal components. This eliminates the risk of loosening or failure associated with bolts or other mechanical connections, thereby enhancing overall structural stability.
Additionally, welded joints distribute loads more effectively than mechanical fasteners, enabling structures to bear heavy loads with greater efficiency. Our scaffolding products also undergo advanced welding techniques such as MIG and TIG welding, resulting in high-quality welds that are robust, secure, and durable.
As the No.1 direct supplier of aluminum kwikstage scaffolding, we strictly control every step from the selection of raw materials to the production process to ensure that every product meets the highest quality standards.
At present, we have many factories and production lines, experienced workers, and the output is guaranteed. We can quickly respond to market changes and customer demand to ensure that your orders can be processed in time.
We provide perfect after-sales service to ensure that any problems you encounter in the course of use can be solved in time. No matter what kind of scaffolding you need, we will try our best to provide you with the most suitable solution.


APAC attaches great importance to product packaging methods to ensure that products can be safely delivered to customers.
We are committed to providing customers with the best service. If you have any needs or questions, please feel free to contact us.
Aluminum kwikstage scaffolds are suitable for a variety of industrial uses such as picking, workshops, and narrow passages. They can provide a convenient working platform several meters high, and they can also work stably in high-rise buildings.




NEED HELP?